Tuesday, June 29, 2010

We have footings

The poured the concrete for the footings for our porches today. These are most of the ones for our front porch and steps.
This is the one in the front that is on the other side of the temporary stairs. There is also a foundation wall on this side of the temporary stairs that will help hold up the front porch. It was poured at the same time as the rest of the foundation.
This is the last of the footings for the back porch. The rest of the footings were poured at the same time the garage floor was poured. You can see the lids to our new septic tanks. Up against the wall to the left is the alarm (you can see the red light on top) that will go off (probably in the middle of the night) when the pump for the effluent fails.

No comments:

Post a Comment