Wednesday, April 28, 2010

Closer to a garage floor

They put the re-bar in the floor of the small garage. They plan to pour the floor of the garages on Friday.
When they pour the garage floor they plan to haul concrete to the back of the house for part of the foundation for the back porch and for the sidewalk to the lower back door. Some of the footings they need for our back porch are next to our current septic tank. We may need to get the new septic system installed soon so they can finish our back porch.
All the siding is installed now. They will paint the new siding soon, maybe as soon as next week.

No comments:

Post a Comment