They are ready to pour the concrete for the two garages and area in between tomorrow. If it isn't raining they also plan to haul the concrete around our house to pour part of the foundation for the back porch. They have the boards so they won't get bogged down in the mud if they pour the back porch foundation.
When we were up on the Jenga stacks a lot of the downspouts fell off. They reattached this downspout so they can dry out the siding before they paint it.
The inspector passed the electrical wiring under the house today. We have lights and outlets in the garage and "walk" space.
Thursday, April 29, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment