Today they finished the duct work and hooked the natural gas up to our furnace. We no longer need to use space heaters. A person could get spoiled by central heating. Whenever they used flexible ducting in the garage area, they added framing to cover it.
They changed the natural gas connection at the meter when they connected our furnace. With this new connection they can complete the wall next to the gas meter.
They are cutting a hole through our new foundation for our water. They need to get the water and sewer out of our walls so they can finish closing in the house.
They filled the other garage with crushed rock. The next step for the garage is to put in the re-bar for the concrete floor.
They also started patching the cracks in the walls of the house.